top of page

Hawthorn Theatrical - Concrete base for lift Shaft

  • Jun 22, 2015
  • 1 min read

One of the large warehouses at Hawthorn Theatrical in Old Dalby, Melton Mowbray is having a large mezzanine floor and lift shaft installed, for extra storage space. We were called in to excavate and install the concrete base and foundation for the lift shaft. This time lapse video shows the work being done which was completed in one day.

 
 
 

Comments


Recent Posts

© 2025 Heritage Probuild Ltd.

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok
bottom of page